NUCLEAR...

Flashscan Can Number: L6B53P20 Original ID: 103141 Alternate ID: FS100180016_0 Preview available at: https://cdn.dam.gettyimages.com/S60V9855/as/qb0h44-flrfzc-9yt2nv/FS100180016_0.mp4 NUCLEAR. CLASSIFICATION: 103141 / 10.1.80 CUTS KEPT: ENGLAND: NUCLEAR: There's been a warning that the 103141 government's plans to build the next generation 10.1.80 of nuclear power stations starting in 1982 could be delayed because of a shortage of safety inspectors. LLOYD-ROBERTS: a) Dungeness plant: Inspector Ross: EKT: Intvw. Ron Gausden, Chief Inspector: b) REMAINS: Dungeness Plant: Intvw. EKT: William Ross: a) Dungeness: CBV Inspector looks at graphs GV PAN exterior of plant CS "Control Rod Position" PULL OUT and PAN dials MS TILT reactor core MS Expansion bellows ZOOM IN MS Inspector Ross walks cont....MS Block swings from floor to show equipment 103141 in pit 10.1.80 MS Inspector Ross looks down PULL OUT CS RON -GA-USDEN (Chief Inspect-or):SOF: "It seems programme." CMS "Control-screens" PULL OUT inspector writes MS PAN over control panels EKT: 16mm: ITN(West) 1.34secs: 59ft: TX'D:10.1.80/NAO: +FINAL MAG: b) REMAINS: MS PULL OUT inspector R-L into building MS Inspector inside talks to technician CS Log book MS PAN over pipes CS WILLIAM-ROSS (Nuclear Inspector):SOF: ''The essence believe so." EKT: 16mm: ,ITN(West) TX'D:10.1.80/ Re-Cut- for NAT and not used

Beschrijving

Flashscan NUCLEAR.||CLASSIFICATION: 103141 / 10.1.80|CUTS KEPT:|ENGLAND: NUCLEAR: There's been a warning that the 103141|government's plans to build the next generation 10.1.80|of nuclear power stations starting in 1982 could|be delayed because of a shortage of safety inspectors.|LLOYD-ROBERTS:|a) Dungeness plant: Inspector Ross: EKT:|Intvw. Ron Gausden, Chief Inspector:|b) REMAINS: Dungeness Plant: Intvw. EKT:|William Ross:|a)|Dungeness: CBV Inspector looks at graphs|GV PAN exterior of plant|CS Control Rod Position PULL OUT and|PAN dials|MS TILT reactor core|MS Expansion bellows ZOOM IN|MS Inspector Ross walks|cont....MS Block swings from floor to show equipment 103141|in pit 10.1.80|MS Inspector Ross looks down PULL OUT|CS RON -GA-USDEN (Chief Inspect-or):SOF:|It seems|programme.|CMS Control-screens PULL OUT inspector|writes|MS PAN over control panels|EKT: 16mm: ITN(West) 1.34secs: 59ft:|TX'D:10.1.80/NAO: +FINAL MAG:|b) REMAINS:|MS PULL OUT inspector R-L into building|MS Inspector inside talks to technician|CS Log book|MS PAN over pipes|CS WILLIAM-ROSS (Nuclear Inspector):SOF:|''The essence|believe so.|EKT: 16mm: ,ITN(West)|TX'D:10.1.80/ Re-Cut- for NAT and not used

BEPERKT MATERIAAL
Deze video is onderdeel van ons Analoge Archief, wat betekent dat deze niet op onze website wordt opgeslagen. Het kan daarom wat langer duren om toegang te krijgen tot deze content en er kunnen extra kosten in rekening worden gebracht. Goedkeuringen en clearances zijn gebaseerd op het beoogde gebruik.
Neem contact met ons op en vertel ons meer over uw project of vraag een preview aan|.

GEGEVENS

Beperkingen:
Neem voor gebruik voor alle commerciële of promotiedoeleinden contact op met uw lokale kantoor.Preview may contain third party content that cannot be licensed by Getty Images; please contact your local sales representative to discuss availability.
Credits:
ITN
Redactioneel nr.:
723493677
Collectie:
ITN Archive
Datum uitzending:
10 januari 1980
Datum van uploaden:
Soort licentie:
Rights ready
Release-informatie:
Geen release. Meer informatie
Bron:
ITN Archive
Barcode:
FS100180016_0
Naam materiaal:
FS100180016_0